1
|
MEDUD8150796
|
TAPS, COCKS, VALVES AND SIMILAR APPLIANCES FOR PIP - P.O. 8006611180 - PNEUMATIC ON - OFF VALVES P.O. 8006611270 - MOTORIZED VALVES EQUIPMENTS AND MATERIALS FOR CBR COKE BOILER REPLACEMENT COGEN & BOP ( CBR PROJECT ) SUNCOR CONTRACT NO. 4600025994 HS CODE : 8481.80 SHIPMENT 80066 OFS 0260 SPAIN
|
TR LEDCOR CBR PROJECT PARTNERSHIP
|
CUNADO,S.A.
|
2023-04-13
|
Spain
|
10316 Kgs
|
21 CAS
|
2
|
MEDUIF640169
|
EQUIPMENTS AND MATERIALS FOR CBR COKE BOILER REP - TOTAL 7 SEVEN WOODEN BOXES CONTROL VALVES EQUIPM ENTS AND MATERIALS FOR CBR COKE BOILER REPLACEMENT COGEN AND BOP CBR PROJECT P.O. 8006611110 SUNCO R CONTRACT NO. 4600025994 SHIPMENT 80066-OFS-0254- INDIA EXPORT INV.NO. 202 22203670 DATED 25.01.2023 AND, 20222203800 DT 07.02 .2023 IEC NO.0703005308 HS CODE: 84818030 S.B. NO. 7794124: DT-15.02.202 3 AND 7794123 DT 15.02.202 3 TOTAL GROSS WEIGHT. 99 13.00 KGS TOTAL NET WEIG HT. 9078.00 KGS FREIGHT PREPAID -ATT: NOLBERTO AND RADE 1 780 242-3858 NOLBER TO J ANDRADE: ANDRADE.NTEC NICASREUNIDAS.ES SHAWN RIT CHIE: SHAWN.RITCHIELEDCOR. COM IRENE HANSON: IRENE.HA NSONLEDCOR.COM TREATMENT C ERTIFICATE NO: SF/23-24/20 085 DATE OF ISSUE:21-02-20 23 DATE OF FUMIGATION: 17- 02-2023
|
TR LEDCOR CBR PROJECT PARTNERSHIP
|
FLOWSERVE INDIA CONTROLS PVT. LTD.
|
2023-04-07
|
China
|
9913 Kgs
|
7 BOX
|
3
|
HLCUDX3221234276
|
STEEL STRUCTURE OF P.O. 8006614010 - STEEL STRUCTURE STEEL STRUCTURE 2 BUNDLES, 8 PIECES
|
TR LEDCOR CBR PROJECT PARTNERSHIP
|
WILLIAM HARE U.A.E. L.L.C.
|
2023-02-18
|
Singapore
|
20266 Kgs
|
41 PCS
|
4
|
HLCUMA3221215373
|
CONTROL VALVES TOTAL 16 (SIXTEEN) WOODEN BOXES P.O.8006611110 - CONTROL VALVES EQUIPMENTS AND MATERIALS FOR, CBR COKE BOILER REPLACEMENT COGEN & BOP (CBR PROJECT) SUNCOR CONTRACT NO. 4600025994 SHIPMENT 80066- OFS-0215-INDIATOTAL GROSS WEIGHT. 13590.00 KGS TOTAL NET WEIGHT. 11470.00 KGS SHIPPING BILL NO 6024938 DT. 08.12.2022 FREIGHT PREPAID XX +1 (780) 242-3858NOLBERTO J ANDRADE ANDRADE.N TECNICASREUNIDAS.ES SHAWN RITCHIE IRENE HANSON
|
TR LEDCOR CBR PROJECT PARTNERSHIP
|
FLOWSERVE INDIA CONTROLS PVT. LTD.
|
2023-02-18
|
Singapore
|
13590 Kgs
|
16 PCS
|
5
|
HLCUDX3221227329
|
STEEL STRUCTURE OF P.O. 8006614010- STEEL STRUCTURE STEEL STRUCTURE 1 BUNDLE, 84 PIECES
|
TR LEDCOR CBR PROJECT PARTNERSHIP
|
WILLIAM HARE U.A.E. L.L.C.
|
2023-02-18
|
Singapore
|
62994 Kgs
|
220 PCS
|
6
|
HLCUDX3221136938
|
STEEL STRUCTURE OF P.O. 8006614010 - STEEL STRUCTURE (STEEL STRUCTURE 1 BUNDLE, 1 CASE, 3 PALLETS, 124 PIECES)
|
TR LEDCOR CBR PROJECT PARTNERSHIP
|
N/A
|
2023-02-02
|
Singapore
|
107401 Kgs
|
526 PCS
|
7
|
HLCUDX3221105300
|
STEEL STRUCTURE OF P.O. 8006614010 - STEEL STRUCTURE 2 BUNDLES, 16 PIECES
|
TR LEDCOR CBR PROJECT PARTNERSHIP
|
WILLIAM HARE U.A.E. L.L.C.
|
2023-01-18
|
Singapore
|
39920 Kgs
|
186 PCS
|
8
|
ALPJMAAEDM00173
|
COKE BOILER REPLACEMENT COGEN & BOP
|
TR LEDCOR CBR PROJECT PARTNERSHIP
|
FLOWSERVE INDIA CONTROLS PVT. LTD.
|
2023-01-01
|
China Taiwan
|
2364 Kgs
|
10 PKG
|
9
|
SNJLSLEDM202118
|
EQUIPMENTS AND MATERIALS FOR CBR COKE BOILER .
|
TR LEDCOR CBR PROJECT PARTNERSHIP
|
AARDING THERMAL
|
2022-11-06
|
Vietnam
|
8960 Kgs
|
8 PKG
|
10
|
EFLR17122208417
|
ISOLATED PHASE BUSDUCT ACCESSORIES
|
TR LEDCOR CBR PROJECT PARTNERSHIP
|
POWER GEAR LIMITED-SEZ
|
2022-11-06
|
Singapore
|
57200 Kgs
|
50 PKG
|