1
|
Equipment for setting up 13.19 MW Power Plant based waste toenergy - Terminator 5000 Discharge conveyor
|
PUNE BIO-ENERGY SYSTEMS PRIVATE LIMITED
|
CISTECH INTERNATIONAL PTE LTD
|
2021-01-19
|
AUSTRIA
|
1.00 NOS
|
2
|
Equipment for setting up 13.19 MW Power Plant based waste toenergy - Sub frames for Hurrikan
|
PUNE BIO-ENERGY SYSTEMS PRIVATE LIMITED
|
CISTECH INTERNATIONAL PTE LTD
|
2021-01-19
|
AUSTRIA
|
1.00 NOS
|
3
|
Equipment for setting up 13.19 MW Power Plant based waste toenergy - Screen Walkway (1000mm wide x 6000mm long)
|
PUNE BIO-ENERGY SYSTEMS PRIVATE LIMITED
|
CISTECH INTERNATIONAL PTE LTD
|
2021-01-19
|
AUSTRIA
|
1.00 NOS
|
4
|
Equipment for setting up 13.19 MW Power Plant based waste toenergy -Screen 20/50,comprising of Star screen proper with
|
PUNE BIO-ENERGY SYSTEMS PRIVATE LIMITED
|
CISTECH INTERNATIONAL PTE LTD
|
2021-01-19
|
AUSTRIA
|
1.00 NOS
|
5
|
Equipment for setting up 13.19 MW Power Plant based waste toenergy - Splitter Unit 625
|
PUNE BIO-ENERGY SYSTEMS PRIVATE LIMITED
|
CISTECH INTERNATIONAL PTE LTD
|
2021-01-19
|
AUSTRIA
|
1.00 NOS
|
6
|
Equipment for setting up 13.19 MW Power Plant based waste toenergy - Screen 20/50 - Stairway (45 degree incline)
|
PUNE BIO-ENERGY SYSTEMS PRIVATE LIMITED
|
CISTECH INTERNATIONAL PTE LTD
|
2021-01-19
|
AUSTRIA
|
1.00 NOS
|
7
|
Equipment for setting up 13.19 MW Power Plant based waste toenergy - Hurrikan S proper with drives
|
PUNE BIO-ENERGY SYSTEMS PRIVATE LIMITED
|
CISTECH INTERNATIONAL PTE LTD
|
2021-01-19
|
AUSTRIA
|
1.00 NOS
|
8
|
Equipment for setting up 13.19 MW Power Plant based waste toenergy - Terminator Substructure ab (Support structure)
|
PUNE BIO-ENERGY SYSTEMS PRIVATE LIMITED
|
CISTECH INTERNATIONAL PTE LTD
|
2021-01-19
|
AUSTRIA
|
1.00 NOS
|
9
|
Equipment for setting up 13.19 MW Power Plant based waste toenergy - Shredding unit TM E, comprising of Terminator 5000
|
PUNE BIO-ENERGY SYSTEMS PRIVATE LIMITED
|
CISTECH INTERNATIONAL PTE LTD
|
2021-01-19
|
AUSTRIA
|
1.00 NOS
|